Pier 84 at Alexandria port Project

Project TypeFood Industry
LocationAlexandria, Egypt
ClientMedina & Guttridge.Company
Project StatusComplete

EMUC has the completion of the work of the mechanical and electrical installations ship unloader Unloading capacity 600 tons/h on Pier 84 at Alexandria port.

The works include:

Steel structure installation for ship unloader -chain conveyors installation -belt conveyors installation

Electrical installations

Installation of cable trays -Laying of cable lines – cable to connect to equipment, paintings, control rooms -Installation of protection devices and connect the equipment.

In addition to designing, supplying, manufacturing and installing Q pipeline and maintenance work for two years for the British Guttridge Company